1935 | Phase two began between Excelsior Boulevard and Wayzata Boulevard. Construction was speeded up from 20,000 yards per month to 120,000 yards per month.


1935 | Phase two began between Excelsior Boulevard and Wayzata Boulevard. Construction was speeded up from 20,000 yards per month to 120,000 yards per month.