Follow the timeline of Lilac Way.

The planning, building, landscaping, preservation and restoration is a fascinating story.

I am indebted to Jeanne Andersen at the St. Louis Park Historical Society for her extensive research. Long on my to-do list, it’s a work-in-progress.

The history of “Highway 100” is a little confusing, because it can either mean:

  • The Original Highway 100, which was built between 1934 and 1941 along 12.5 miles between Highway 5 (78th Street) in Edina and Highway 52 (now Highway 81) in Robbinsdale;
  • The Present Highway 100, which runs from I-494 to I-694; or
  • The “Belt Line,” which was a precursor to the present 494/694 circle around the Twin Cities. This Belt Line, of which the Original and Present Highways 100 were a part of, existed from 1950 to 1965

Thanks to Jeanne Andersen for this clarification.

1922
Carl Graeser joined MN Highway Department as a project engineer
Carl Graeser joined MN Highway Department as a project engineer

1922 | Born and raised in Germany, Carl Graeser earned a civil engineering degree from Vermont’s Norwich University in 1909. He joined the Minnesota Highway Department (now MnDOT) as a project engineer in 1922. He became a champion for the Belt Line project.

1928
Engineer Carl Graeser appeared before St. Louis Park Village Council for consent
Engineer Carl Graeser appeared before St. Louis Park Village Council for consent

April 5, 1928 | Highway Engineer Carl Graeser appeared before the St. Louis Park Village Council to obtain consent to the plans and specs for Highway 5 (100). It became a village in 1886.

1930
Highway 100 planning began
Highway 100 planning began

1930 | It was to be built along 12.5 miles between Highway 5 (78th Street) in Edina and Highway 52 (now Highway 81) in Robbinsdale.

1931
Officials agreed to construct Belt Line with Highway 100

July 23, 1931 | State and county officials agreed on plans to construct the Belt Line road along western limits, which was authorized at the last session of the legislature. They approved an 11-mile stretch from Robbinsdale to Highway 52. (Highway 100’s route eventually spanned 12.5 miles to 78th Street in Edina.)

1932
Arthur R. Nichols, Landscape Architect, started working for MN Highway Department
Arthur R. Nichols, Landscape Architect, started working for MN Highway Department

1932 | Arthur R. Nichols became the Roadside Development Division’s Consulting Landscape Architect, remaining until 1940. He designed and supervised the execution of Highway 100 and Lilac Way. Nichols was trained in engineering and highway design, as well as in landscape architecture.

Appraisers appointed to proposed acquisition of land

April 18, 1932 | The land was previously farmland and personal residences. Many properties were purchased through eminent domain.

Obermeyer family farm purchased for Highway 100 easement
Obermeyer family farm purchased for Highway 100 easement

Early 1930s | (Need to confirm date) A son of an immigrant from Hanover, Germany, Dr. Fred C. Obermeyer’s family farm was one of many purchased for an easement to build the West Belt Line Highway in the 1930s. Their farm was sold so Highway 100’s Lilac Way could be built. The designer of the Belt Line was Carl Graeser, a German immigrant born in Windisch-Marchwitz, Schlesien, Germany. Photo: Beth Sartor Obermeyer.

1933
President Franklin D. Roosevelt’s inaugural address launched New Deal
President Franklin D. Roosevelt’s inaugural address launched New Deal

March 4, 1933 | He declared a war against economic hardship as nation was reeling from the Great Depression. His New Deal program launched the Works Progress Administration (WPA) to provide employment. Highway 100’s Lilac Way was MN’s largest WPA project.

Public Works Administration (PWA) was formed under FDR
Public Works Administration (PWA) was formed under FDR

June, 1933 | A New Deal agency, the PWA was set up by Pres. Franklin D. Roosevelt to reduce unemployment through the construction of highways and public buildings. These projects created jobs and stimulates the economy during the Great Depression. Unskilled workers were required to be local. When possible, men, horses, and hand tools would be used instead of heavy machinery, to provide work.

Road survey done

Summer, 1933 | A survey of the route was done using two crews, one truck, and equipment left over from World War I.

1934
Excavation for first Highway 100 segment began
Excavation for first Highway 100 segment began

1934 | Excavation for the first Highway 100 segment began in Edina. This leg of the new highway extended from West 50th Street/Vernon Avenue in Edina to Excelsior Boulevard in St. Louis Park.

1935
Phase two highway construction began

1935 | Phase two began between Excelsior Boulevard and Wayzata Boulevard. Construction was speeded up from 20,000 yards per month to 120,000 yards per month.

WPA stepped in to complete unfinished FERA projects
WPA stepped in to complete unfinished FERA projects

1935 | The Federal Emergency Relief Administration (FERA) was a program established by President Franklin D. Roosevelt in 1933. It was replaced in 1935 by the Works Progress Administration (WPA).

Land to build Belt Line bought at 16x book value
Land to build Belt Line bought at 16x book value

April 3, 1935 | Land for the Belt Line highway around Minneapolis near Wayzata Boulevard was bought by the state highway department at 16 times its book value. The average price of $1,150 per acre was paid for 45.33 acres.

First lilacs planted on Highway 100’s Lilac Way
First lilacs planted on Highway 100’s Lilac Way

1935 | The first 3,500 of 7,000 lilacs were planted along two miles of highway between Glenwood Avenue and Medicine Lake Road in Golden Valley, MN.

Men boarded buses after a long day of working on Highway 100
Men boarded buses after a long day of working on Highway 100

July 9, 1935 | Highway 100 helped provide work for 3,500 homeless men. Each man worked six hours a day for six days  and were limited to 40 hours per month. They earned 55 cents an hour or $19.80 in cash in lieu of the $10.80 they had received in meal and lodging tickets. The men had previously been transported in open dump trucks.

‘Lilac Way’ approved, built to attract tourists to Highway 100
‘Lilac Way’ approved, built to attract tourists to Highway 100

July 28, 1935 | Inspired by Washington, D.C.’s cherry blossoms, in 1935 the Minneapolis Journal proposed planting lilacs along the new Highway 100. More than 50,000 citizens in 40 civic and business groups supported the idea. The Minnesota Highway Department Department agreed, and Lilac Way’s story began. The headline proclaimed, “Highway Department Approves ‘Lilac Way’ West of City, Journal’s Plan for Beautifying Belt Line OK’d.”

Men given physical examinations for largest Federal work relief project in MN
Men given physical examinations for largest Federal work relief project in MN

1935 | After 4,500 men were given physical exams, 3,000 were qualified to work on the Highway 100 project. As the largest Federal work relief project in MN, the Belt Line’s construction provided an immediate boost to the economy. At the height of the Great Depression, nearly one in four Americans was unemployed. Photo by John Vachon.

State urged to add a dirt road for horses, hackneys with snappy carts
State urged to add a dirt road for horses, hackneys with snappy carts

August, 1935 | C.M. Stafford of the Saddle and Bridle Club urged the state to add a dirt or tanbark road for the purpose of driving horses: “hackneys with snappy carts,” then a popular occupation. He stated that there were more than 2,500 people who rode or drove horses in Minneapolis.

1936
Railroad overpass constructed at Highway 7
Railroad overpass constructed at Highway 7

Two bridges spaced 10 ft. apart were under construction for the Milwaukee/St. Louis Railroad railroad overpass at Highway 7.

1937
Approximately 1,500 men worked on the project every day
Approximately 1,500 men worked on the project every day

1937 | Approximately 1,500 men worked on the project every day. As the largest Federal work relief project in the state, the building of the Belt Line provided an immediate boost to the economy. Its biggest year was 1938. In Minnesota, 600,000 people had been employed by the WPA.

Golden Valley Garden Club sold French lilac bushes for Highway 100
Golden Valley Garden Club sold French lilac bushes for Highway 100

Late 1930s | The Garden Club sold French lilac bushes (15 cents) and peony roots door-to-door to pay for plantings along the local stretch of Highway 100. They raised enough money to purchase almost 7,000 lilacs to beautify the new Lilac Way, the showcase section of Highway 100.

Glenwood Avenue to Highway 52 (now 81) construction began
Glenwood Avenue to Highway 52 (now 81) construction began

1937 | Construction began on the northern section of Highway 100, from Glenwood Avenue to Highway 52 (now 81).

Golden Valley celebrated opening highway section
Golden Valley celebrated opening highway section

July, 1937 | The opening of (one section of) the new highway was celebrated with a picnic in Golden Valley. Thousands gathered for sports events, fireworks and a salute to city pioneers.

Highway department said Highway 100 would be completed by 1938
Highway department said Highway 100 would be completed by 1938

August, 1937 | The Minneapolis Journal reported that work would be accelerated so Highway 100 could be open between Excelsior Blvd. and Robbinsdale before winter. The state highway department said the project would be completed by 1938. Two bridges had yet to be built, although the cloverleaf at Wayzata Blvd. was underway. Only 400 men were at work on the project.

Grading of 3.7 miles between Wayzata Blvd. and Robbinsdale completed
Grading of 3.7 miles between Wayzata Blvd. and Robbinsdale completed

Grading of 3.7 miles between Wayzata Blvd. and Robbinsdale complete

Highway 100’s Cloverleaf on Highway 12 opened
Highway 100’s Cloverleaf on Highway 12 opened

November 26, 1937 | The Highway 100 / Highway 12 Cloverleaf was opened. Construction had started on June 20. The Hennepin County Review reported that the cloverleaf was the “Northwest’s first cloverleaf highway grade separation.”

Planned Excelsior Boulevard coverleaf interchange changed to Highway 7

December, 1937 | A cloverleaf was planned for Excelsior Boulevard. An article stated that the new Highway 7 was carrying the heaviest traffic load in the state, so plans for the second cloverleaf were changed from Excelsior Blvd. to Highway 7.

Highway 100 construction was nearly completed

December, 1937 | The Minnesota Highway Department reported that Highway 100’s construction was 80% completed.

1938
Only two bridges need to be completed
Only two bridges need to be completed

January, 1938 | The bridges at Highway 7 and Minnetonka Blvd. were the only things preventing the opening of the new highway. Fourteen bridges had already been built, including an ornamental concrete bridge over Minnehaha Creek in Edina, and the bridge that went over 44th Street and the streetcar tracks.

Highway Commissioner Elsberg called Lilac Way “one of the most beautiful in the world”
Highway Commissioner Elsberg called Lilac Way “one of the most beautiful in the world”

January 30, 1938 | Nels W. Elsberg, MN State Highway Commissioner (1933-38), stated that the new section of highway was not only safer than earlier roads in the state, but nothing less than “one of the most beautiful in the world” (Minneapolis Journal).

1939
Overpasses completed

1939 | The Highway 7 and Minnetonka Boulevard overpasses were completed.

Highway 7 cloverleaf interchange opened
Highway 7 cloverleaf interchange opened

1939 | When the cloverleaf at Highway 7 opened, it required 30 acres of land and cost $65,000 ($1,500,000 in 2025 dollars).

3M’s Scotchlite product was used on traffic control signage
3M’s Scotchlite product was used on traffic control signage

September 1, 1939 | 3M’s Scotchlite Reflective Material was used on traffic control signage, and installed at the Highway 7 cloverleaf. 3M was founded in Minnesota in 1902.

1940
Graeser Park construction completed
Graeser Park construction completed

1940 | Construction of Graeser Park, the largest of Lilac Way’s seven parks, was completed. It included a beehive fireplace, 18 stone picnic tables, and a rock garden.

1941
Highway 100 between Edina and Robbinsdale completed
Highway 100 between Edina and Robbinsdale completed

January 10, 1941 | Highway 100 between Highway 5 (78th Street) in Edina and Highway 52 (now Highway 81) in Robbinsdale was completed. It included more than 7,000 bushes of 12 varieties of lilacs and thousands of other shrubs, vines, and trees. With the onset of World War II, workers and materials were diverted to the war effort.

1942
Construction is completed
Included more than 7,000 bushes of 12 varieties of lilacs and thousands of other shrubs, vines, and trees.
1944
Highway engineer Carl F. Graeser died of heart attack
Highway engineer Carl F. Graeser died of heart attack

March 15, 1944 | Known as the ‘Father of the Belt Line’, Carl F. Graeser, 70, was found dead at the wheel of his car. Lilac Way’s Graeser Park in Robbinsdale, MN, is his namesake.

1950
Highways, roads combined for 66-mile Belt Line around Twin Cities

1950 | The Highway Department combined new highways and existing roads to form a 66-mile radial route around Minneapolis/St. Paul. For 15 years, this entire Belt Line was also known as Highway 100. The road in South St. Paul was comprised mostly of industrial roads. The concept of the Belt Line was lost with the construction of 494/694 in 1965.

1951
20,313 vehicles traveled on Highway 100
20,313 vehicles traveled on Highway 100

July, 1951 | On just one day, more than 20,000 vehicles were counted traveling down Highway 100 north of Excelsior Boulevard at a a 50 mph speed limit.

1955
Richfield Ok’d ‘Super’ Belt Line plan
Richfield Ok’d ‘Super’ Belt Line plan

July 12, 1955 | Council approved state highway department’s 4-lane divided highway ‘Super’ Belt Line across 78th St., to be the first link in an 80-mile super-highway encircling the Twin Cities.

1959
Glenwood Avenue Park razed for road construction
Glenwood Avenue Park razed for road construction

1959 | Glenwood Avenue Roadside Park was the first Lilac Way park to be lost to road construction. It featured picnic tables and a rectangular fireplace with two grilling areas in the NW corner of Highway 100 and Glenwood Avenue in Golden Valley, MN.

1965
The “Highway 100” Belt Line name is no longer used

1965 | With the completion of 494/694 in 1965, the term “Highway 100” Belt Line was no longer in use. It is no longer possible to directly follow the path of the old Belt Line.

1969
Excelsior Boulevard Park razed for road construction
Excelsior Boulevard Park razed for road construction

1969 | Located on the busiest and deadliest intersection in MN, Lilac Way’s Excelsior Boulevard Park on Highway 100 was razed for road construction. It featured a beehive fireplace, stone picnic tables, a stone signpost and a parking structure.

1970
Landscape Architect Arthur Nichols died
Landscape Architect Arthur Nichols died

January 23, 1970 | Lilac Way’s landscape architect Arthur Nichols died in Rochester, MN at 89. He was a consultant for the MN Highway Department in the 1930s.

2008
Restore Lilac Way toured MnDOT’s ‘Beehive Graveyard’
Restore Lilac Way toured MnDOT’s ‘Beehive Graveyard’

April 25, 2008 | Karen Laukkonen was stunned to see salvaged 1930s Lilac Way stone picnic table tops, bases and stone pieces stacked in a MnDOT parking lot. Known as the ‘Beehive Graveyard’, the stone was salvaged from three parks before they were razed for 2001 road construction. It included Graeser Park’s picnic tables, removed to create a construction staging area.

Campaign to Restore Lilac Way and web site launched
Campaign to Restore Lilac Way and web site launched

May 7, 2008 | Inspired by TPT’s ‘Highway 100: Lilac Way” film, Karen Laukkonen developed a campaign to restore 3,000 lilacs with community sponsorship, reduce strain on municipal and MnDOT budgets and revive pride in a historic area. The project has now changed to Restore Lilac Way to document history and support restoration.

St. Louis Park saved rare beehive fireplace from demolition
St. Louis Park saved rare beehive fireplace from demolition

October 22, 2008 | The city of St. Louis Park saved this rare 1930s beehive fireplace from demolition for road construction. It was carefully moved from Minnetonka Boulevard to another Lilac Way park near Highway 7, just one mile south.

2009
Grand Opening of renewed Lilac Park
Grand Opening of renewed Lilac Park

July 13, 2009 | Lilac Park was beautifully revived by the city of St. Louis Park, MN. It includes a beehive rescued from demolition, five picnic tables and a council ring. It is located at Highway 100 and County Road 25/Highway 7, just west of Nordic Ware.

2018
Restore Lilac Way launched updated web site
Restore Lilac Way launched updated web site

April 29, 2018 | Karen Laukkonen launched a completely rebuilt and redesigned restorelilacway.com site. First launched in 2008, it included mobile design, tons of new info and many historic documents and photos.

2020
Restore Lilac Way call to Andrea Weber at MnDOT demonstrated community support, led to preservation and restoration projects
Restore Lilac Way call to Andrea Weber at MnDOT demonstrated community support, led to preservation and restoration projects

August 8, 2020 | Karen Laukkonen at Restore Lilac Way contacted Andrea Weber, Manager of MnDOT Historic Roadside Properties Program, to approve an Eagle Scout project in Rock Island Park. This innocent request changed Lilac Way’s history forever, leading Andrea to investigate Graeser Park and Rock Island Park. After seeing enthusiastic community support for both historic parks, she directed a three-year, $500,000 Graeser Park restoration and removed diseased trees and invasive species while preserving the intact original lilacs in Rock Island Park.

2021
MnDOT launched three-year Graeser Park restoration and preservation project
MnDOT launched three-year Graeser Park restoration and preservation project

Spring, 2021 | Andrea S. Weber, Professional Landscape Architect and Program Manager of MnDot’s Historic Roadside Property Program, directed a series of restoration projects at Graeser Park totaling just under $500,000.

MnDOT launched cleanup project in Rock Island Park
MnDOT launched cleanup project in Rock Island Park

Spring, 2021 | MnDOT Historic Roadside Properties and Waysides Program directed a project to remove diseased trees and invasive species, and preserved the intact 1930s lilac hedge.

First of 11 picnic tables rebuilt in Graeser Park
First of 11 picnic tables rebuilt in Graeser Park

July, 2021 | A demonstration project with Northern Bedrock Historic Conservation Corps reconstructed one full table and pad in rock garden, using salvaged stone pieces stored in the Robbinsdale Public Works Yard. Included work on two picnic table pads in picnic area and some repointing on the overlook wall. Advanced Masonry Inc. was the Masonry Technical Expert.

2023
SLP accepted Rock Island Park’s rock garden at no charge from MnDOT
SLP accepted Rock Island Park’s rock garden at no charge from MnDOT

May 1, 2023 | The St. Louis Park City Council voted to save historic Rock Island Park. A Say YES! to Rock Island Park Virtual Rally urged the city to save it from development. The north meadow parcel was purchased for $186,000.

MnDOT completed three-year Graeser Park restoration project
MnDOT completed three-year Graeser Park restoration project

June 30, 2023 | MnDot’s Historic Roadside Property Program completed their $500,000 project to preserve and restore Graeser Park. They restored the rare 1940 beehive fireplace, rebuilt 11 picnic tables, added accessible walks and repointied the rock garden pond walls and benches.

2024
Graeser Park became eligible for National Register of Historic Places
Graeser Park became eligible for National Register of Historic Places

January 22, 2024 | After reviewing documentation from MnDOT, the Minnesota State Historic Preservation Office (SHPO) agreed that Graeser Park is eligible for listing in the National Register of Historic Places (NRHP).

2025
Graeser Park added to the National Register of Historic Places
Graeser Park added to the National Register of Historic Places

December 23, 2025 | Thanks to MnDOT, dedicated volunteers, and a passionate community, Graeser Park was officially added to the National Park Service’s National Register of Historic Places.